basically, now we found some tyres as our floating materials..and it costs us around RM30...worth it la..beter den tenggelam,..lagipun , boleh guna utk main di sungai..beach!!! haha...our structure will be mainly built next week as we have to lend a drill from the bengkel..however, all the materials are ready..team GENESIS are confident!

Tuesday, August 24, 2010

After gathering our materials, we have decided and deligated jobs and tasks to each member.
FoongYouSheng: Blog and documentation, base
Shew Chin Teck: Base, connections
Ong Boon Keong: Top part of Poseidon


Hopefully, we can finish building the top of Poseidon by this weekend and by next week, start with our base...and after raya, we will discuss on the aesthetic value, assemble, test and we are way to go on Sept 22!!!

So, to begin with, me(yousheng) and chintek went around komtar to search for connectors and the dried bamboo to be used. Apparently, Ong can't join us as he had issues..ohwell..the search must go on...here were found the dried bamboo and found some connectors...hope this works...
searching for our materials.
there i was,,cutting the bamboo
connectors
Add caption
apling maggie oil to reduce fricion on saw

We decided to saw the bamboo today..all 3 members were present and progress is as planned....we are confident...

Ong cutting the bamboos

Thursday, August 19, 2010

Joints



Recently, we found the information to joint the bamboo stick from internet.... I think that is very useful in this project!!

Friday, August 13, 2010

Second discussion

 The basic model we had done....



2 of the model, which shape was better??



 
 Sketching out the idea.....



 
 Explaining the structure....




 The sketching of idea....



 
 Like a mess...




Measuring the tile to get the measurement.





 Fong sat on the floor, to get the surface area of base.



 
Arguing about the measurement....


  In this discussion, we decided the shape of the craft and the surface area of the base.

Then, we planned to buy the bamboo from bamboo supplier.

Tuesday, August 3, 2010

First discussion about craft!!

Finding the information through computer...

Paying 100% attention...


Identifing the problem...


Explaining the rough idea.



Ong was sketching.


Conteng in the book...



adding again.....



In first discussion about dome, we identified some problem that we will face in this project!!
  • the material of the base- to make sure the geodesic dome can float above water.
  • the design of the joint- to make sure it can set up in 30 minutes.
  • the bamboo- we will use a lot of bamboo in the project and the place we can buy it.